Stay up to date with the latest news
Subscribe to our telegram channel
Tender was announced to engineering and supply of equipment on “turnkey” basis for waste disposal plant with the capacity of 16 million cubic meters a year. The project implementation should help to keep the volume of oil products in sewage at the level of 1 mg per liter.
According to the tender terms, the proposals will be accepted till 27 June 2011. The project will be realized within a year.
Uzbekneftegaz will finance the project due to own resources.
Ferghana Oil Processing Plant has been commissioned in 1959 and currently produces over 60 oil products. The capacity of the plant is 5.5 million tonnes of oil a year.